SRAS Consultations
AEMO has concluded consultations on the SRAS Documents, with version 2.0 of the SRAS Documents effective from 15 December 2011.
These consultations were conducted under chapter 3.11.4A, 3.11.4B, and 3.11.5 of the National Electricity Rules (Rules) in accordance with the Rules consultation requirements detailed in clause 8.9 of the Rules. The relevant clauses in chapter 3.11.4 and 3.11.5 of the NER for the SRAS Documents are listed below:
No. |
SRAS Documents |
Clauses of the NER |
1 |
SRAS Assessment Guidelines |
3.11.4A(e) |
2 |
Boundaries of Electrical Sub-Networks |
3.11.4B(b) |
3 |
SRAS Description |
3.11.4A(d) |
4 |
SRAS Quantity Guidelines |
3.11.4A(f) |
5 |
SRAS Tender Guidelines |
3.11.5(b) |
The SRAS consultation documentation is available on AEMO’s website at the following links:
- SRAS Assessment Guidelines: http://www.aemo.com.au/electricityops/sras_1.html
- Boundaries of Electrical Sub-Networks: http://www.aemo.com.au/electricityops/sras_2.html
- SRAS Description: http://www.aemo.com.au/electricityops/sras_3.html
- SRAS Quantity Guidelines: http://www.aemo.com.au/electricityops/sras_4.html
- SRAS Tender Guidelines: http://www.aemo.com.au/electricityops/sras_5.html
Second Stage Consultation Submissions
There was only one submission made to Second Stage of Consultations:
First Stage Consultation Submissions
The following participants made submissions to First Stage Consultation:
First Stage Meetings
In response to the above submissions, AEMO held the following meetings in order to discuss the issues raised in the submissions:
Detailed information can be found in the links above.
Please forward any queries on these consultations to ASconsultation@aemo.com.au.