Documents relating to RIT-Ts currently being conducted by AEMO.
This Project Specification Consultation Report has been prepared by the Australian Energy Market Operator (AEMO) to consult with National Electricity Market (NEM) registered participants and interested parties on proposed new reactive support to alleviate voltage stability constraints in Regional Victoria.
Interested parties are invited to make submissions on this report by 23 April 2012
| Regional Victoria Reactive Support – Project Specification Consultation Report 30 Jan 2012 | filename: 0170-0052.pdf |
This Project Specification Consultation Report has been prepared by the Australian Energy Market Operator (AEMO) to consult with National Electricity Market (NEM) registered participants and interested parties on the analysis and the identified preferred option under the Victorian Reliability Support RIT-T.
Interested parties are invited to make submissions on this report by 16 March 2012
| Victorian Reliability Support – Project Specification Consultation Report 19 Dec 2011 | filename: 0170-0050.pdf |
This Project Specification Consultation Report has been prepared by the Australian Energy Market Operator (AEMO) to consult with National Electricity Market (NEM) registered participants and interested parties on proposed new reactive support to alleviate voltage stability constraints in the Eastern Metropolitan Melbourne region of Victoria.
Interested parties are invited to make submissions on this report by 17 February 2012
| Eastern Metropolitan Melbourne Reactive Support – Project Specification Consultation Report 22 Nov 2011 | filename: 0170-0048.pdf |
This Project Specification Consultation Report has been prepared by the Australian Energy Market Operator (AEMO) to consult with National Electricity Market (NEM) registered participants and interested parties on credible options to alleviate thermal capacity constraints in the Eastern Metropolitan Melbourne region of Victoria.
Interested parties are invited to make submissions on this report by 17 February 2012
| Eastern Metropolitan Melbourne Thermal Capacity – Project Specification Consultation Report 22 Nov 2011 | filename: 0170-0047.pdf |
AEMO and ElectraNet are undertaking a joint Regulatory Investment Test for Transmission (RIT-T) to investigate increasing the capacity of the existing 275 kV interconnector between Victoria and South Australia.
| Project Specification Consultation Report 31 Oct 2011 | filename: 0170-0044.pdf |
|
| Heywood Interconnector upgrade RIT-T - Forum Presentation 28 Nov 2011 | filename: 0177-0003.pdf |