The Electricity Transmission Use of System (TUOS) Prices for the period 1 July 2011 to 30 June 2012 provide TUOS prices for each transmission terminal station in Victoria.
These prices are used to calculate the charges applicable for each Distributor and transmission connected load in Victoria.
TUOS prices are recalculated annually in accordance with Chapter 6A of the National Electricity Rules.
Electricity Transmission Use of System Prices - 1 July 2011 to 30 June 2012 |
|
Electricity Transmission Use of System Prices - 1 July 2010 to 30 June 2011 |
|
| Electricity Transmission use of System Prices 2009/10 Document published by VENCorp on 15 May 2009 providing TUoS charges covering the transmission network in Victoria for the period 1 July 2009 to 30 June 2010 |
This document establishes how AEMO calculates the amount to be recovered from its Victorian electricity Transmission Use of System (TUOS) charges.
Revenue Methodology for Victoria’s Electricity Transmission System |
Under Chapter 6A of the National Electricity Rules, AEMO is required to publish its methodology for calculating Transmission Use of System prices to apply to each transmission terminal station in Victoria. The methodology must be consistent with the pricing methodology guidelines published on the web site of the Australian Energy Regulator (AER). The AER’s pricing methodology can be accessed via the following link.
Revised Proposed Pricing Methodology |